{"id":2304,"date":"2021-12-07T13:01:29","date_gmt":"2021-12-07T14:01:29","guid":{"rendered":"https:\/\/backend-ugpe.gov.cv\/?post_type=projetos&#038;p=2304"},"modified":"2026-01-19T22:56:27","modified_gmt":"2026-01-19T23:56:27","slug":"projeto-de-recuperacao-e-reforma-do-sector-de-eletricidade","status":"publish","type":"projetos","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-de-recuperacao-e-reforma-do-sector-de-eletricidade\/","title":{"rendered":"Electricity Sector Recovery and Reform Project"},"parent":0,"template":"","meta":{"om_disable_all_campaigns":false,"_mi_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"areas_de_projeto":[51],"estado_do_projeto":[],"class_list":["post-2304","projetos","type-projetos","status-publish","hentry","areas_de_projeto-energia"],"acf":{"id_do_projeto":"P115464","entidades_beneficiarias":false,"gestor_do_projeto":{"ID":2575,"post_author":"13","post_date":"2022-01-28 11:21:45","post_date_gmt":"2022-01-28 12:21:45","post_content":"","post_title":"Special Projects Management Unit","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"ugpe","to_ping":"","pinged":"","post_modified":"2022-03-24 10:54:09","post_modified_gmt":"2022-03-24 11:54:09","post_content_filtered":"","post_parent":0,"guid":"https:\/\/backend-ugpe.gov.cv\/?post_type=gestor_de_projeto&#038;p=2575","menu_order":0,"post_type":"gestor_de_projeto","post_mime_type":"","comment_count":"0","filter":"raw","post_title_ml":"[:pt]Unidade de Gest\u00e3o de Projetos Especiais[:en]Special Projects Management Unit[:]","post_title_langs":{"pt":true,"en":true}},"data_de_entrada_em_vigor":"30\/03\/2012","data_de_encerramento":"30\/03\/2018","estado":"Encerrado","valor_inicial":"4119500000","valor_adicional":"","valor_total":"4119500000","percentagem_de_execucao":"100","objetivo":"The Recovery and Reform of the Electricity Sector project aims to increase the production capacity of electricity on the islands of Santiago and S\u00e3o Vicente, and to support the reduction of losses and the operational and financial performance of Electra.","descricao":"This project is in line with the strategy that a secure and sustainable energy sector, in particular the electricity subsector, is fundamental to the achievement of the Economic Transformation Agenda. This, bearing in mind that energy is one of the important vectors in any sustained development strategy, and its availability in quantity and quality is one of the main drivers of economic development.","imagem":{"ID":10184,"id":10184,"title":"fi_poster","filename":"fi_poster.png","filesize":2169408,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/fi_poster.png","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-de-recuperacao-e-reforma-do-sector-de-eletricidade\/fi_poster\/","alt":"","author":"10","description":"","caption":"","name":"fi_poster","status":"inherit","uploaded_to":2304,"date":"2026-01-19 23:51:10","modified":"2026-01-19 23:51:10","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/default.png","width":1421,"height":1421,"sizes":{"thumbnail":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/fi_poster-150x150.png","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/fi_poster-300x300.png","medium-width":300,"medium-height":300,"medium_large":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/fi_poster-768x768.png","medium_large-width":768,"medium_large-height":768,"large":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/fi_poster-1024x1024.png","large-width":1024,"large-height":1024,"1536x1536":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/fi_poster.png","1536x1536-width":1421,"1536x1536-height":1421,"2048x2048":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/fi_poster.png","2048x2048-width":1421,"2048x2048-height":1421}},"componentes":[{"titulo_do_componente":"Component 1: Priority Investments in the Electricity and Water Sectors","objetivo":"This component aims to focus on priority investments that will allow","moeda_componente":"USD","valor_moeda_estrangeira_componente":"42500000","valor":"3272500000","beneficiarios_componentes":false,"subcomponente":[{"titulo_do_subcomponente":"Extension of the Palmarejo Power Plant in the city of Praia (Santiago Island,) including the strengthening of the production capacity through the installation of two electricity generating units of 10MW each, fueled by heavy fuel oil (HFO).","objetivo":"This subcomponent aims to strengthen the production capacity through the installation of two electricity generating units of 10MW each, fueled by heavy fuel oil (HFO)","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"30000000","valor":"2310000000","beneficiarios":false},{"titulo_do_subcomponente":"Extension of the Lazareto Plant in Mindelo (S\u00e3o Vicente Island) to receive two 5.5.MW heavy fuel oil (HFO) electricity generating units","objetivo":"This subcomponent is intended to receive two 5.5.MW heavy fuel oil (HFO) electricity generating units","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"11000000","valor":"847000000","beneficiarios":false},{"titulo_do_subcomponente":"Additional Water Production Storage Capacity in Palmarejo through the construction of (2) two water storage reservoirs of 1500 m3 each, including installation of the respective electromechanical infrastructure.","objetivo":"This subcomponent aims to provide extra water storage capacity that will also bring more flexibility to ELECTRA regarding water production through desalination, which is an electricity intensive process and will positively contribute to the optimization of energy production","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"","valor":"","beneficiarios":false}],"indicador":[{"titulo_do_indicador":"Additional generation capacity built under the project on the islands of S\u00e3o Vicente and Santiago","unidade_de_medida":"MV","baseline":"","end_target":"","subindicador":[{"titulo":"On the island of S\u00e3o Vicente","unidade_de_medida":"MW","baseline":"0.00","end_target":"5.5"},{"titulo":"On the island of Santiago","unidade_de_medida":"MV","baseline":"0.00","end_target":"20"}]},{"titulo_do_indicador":"Additional water storage capacity","unidade_de_medida":"M3","baseline":"0.00","end_target":"3000","subindicador":false},{"titulo_do_indicador":"Reduction in variable costs of electricity generated","unidade_de_medida":"percentage","baseline":"0.00","end_target":"17","subindicador":false}]},{"titulo_do_componente":"Component 2: Support for ELECTRA's Loss Reduction Plan","objetivo":"This component aims to finance a series of loss reduction activities","moeda_componente":"USD","valor_moeda_estrangeira_componente":"6000000","valor":"462000000","beneficiarios_componentes":false,"subcomponente":[{"titulo_do_subcomponente":"Improving ELECTRA's ability to measure the transit of electrical energy at different levels of the production, transport and distribution chain,","objetivo":"This subcomponent is intended to finance metering equipment designed to improve ELECTRA's ability to correctly measure energy balances at different levels of the electricity transmission and distribution chain, and thus enable the control of energy flow","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"2300000","valor":"177100000","beneficiarios":false},{"titulo_do_subcomponente":"Support for reducing electricity distribution losses by  preventing meter and metering installation tampering including through the  provision and installation of metering technology","objetivo":"This subcomponent is intended to finance improvement of metering technology for  about 16,000 customers in Praia currently below the MV\/LV transformer  level","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"3200000","valor":"246400000","beneficiarios":false},{"titulo_do_subcomponente":"Granting and installation of a remote automatic reading management system","objetivo":"This subcomponent aims to finance the design and installation of an automatic Metering Management System to ensure adequate management and optimization of the installed remote metering capacities in the existing system","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"500000","valor":"38500000","beneficiarios":false}],"indicador":[{"titulo_do_indicador":"Measurement of the network (at the supply level) in order to implement the loss reduction plan","unidade_de_medida":"percentage","baseline":"0.00","end_target":"100","subindicador":false},{"titulo_do_indicador":"Residential meters installed in Praia","unidade_de_medida":"number","baseline":"10.000","end_target":"16.000","subindicador":[{"titulo":"of which prepaid","unidade_de_medida":"number","baseline":"2.000","end_target":"3.000"}]}]},{"titulo_do_componente":"Component 3: Support for ELECTRA's Restructuring and Sector Governance","objetivo":"This component aims to support the Government in sector reform and restructuring","moeda_componente":"USD","valor_moeda_estrangeira_componente":"1500000","valor":"115500000","beneficiarios_componentes":false,"subcomponente":[{"titulo_do_subcomponente":"Support for activities related to the reform of the electricity sector and the reorganization of ELECTRA","objetivo":"This subcomponent aims to provide technical assistance to support the Government and ELECTRA in implementing the restructuring of the Company","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"","valor":"","beneficiarios":false},{"titulo_do_subcomponente":"Support for monitoring the Performance Contract signed between the Government and ELECTRA's Board of Directors","objetivo":"This subcomponent aims to provide technical assistance through the recruitment of an independent audit firm to monitor the execution of the contract","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"","valor":"","beneficiarios":false}],"indicador":[{"titulo_do_indicador":"General energy losses (ELECTRA-wide","unidade_de_medida":"percentage","baseline":"26.7","end_target":"16.3","subindicador":false},{"titulo_do_indicador":"Electricity capture rate in Praia","unidade_de_medida":"percentage","baseline":"93.08","end_target":"97.17","subindicador":false},{"titulo_do_indicador":"Average Interruption Duration (AID) at the Beach","unidade_de_medida":"hour","baseline":"69.67","end_target":"48.73","subindicador":false},{"titulo_do_indicador":"Financial and Sector Performance Monitoring implemented","unidade_de_medida":"yes\/no","baseline":"no","end_target":"yes","subindicador":false}]},{"titulo_do_componente":"Component 4: Implementation, Communication, and Monitoring and Evaluation","objetivo":"This component has the objective of providing the necessary technical assistance and support the UIP for the effective implementation and supervision of the Project,","moeda_componente":"USD","valor_moeda_estrangeira_componente":"3000000","valor":"232200","beneficiarios_componentes":false,"subcomponente":[{"titulo_do_subcomponente":"Strengthening UGPE's Capacity for effective Project management, implementation, and supervision","objetivo":"This subcomponent calls for the recruitment of technical assistance services, training, audits, and the concession and implementation of a communication campaign about the Project, namely about the implementation of the Project and the reform of the sector","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"","valor":"","beneficiarios":false},{"titulo_do_subcomponente":"Support to ELECTRA in the effective supervision of Subcomponents 1.1 and 1.2 of the Project","objetivo":"This subcomponent has the objective of ensuring technical assistance (recruitment of a consultant from the engineering area - Owner's engineer)","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"","valor":"","beneficiarios":false}],"indicador":false}],"grupos_de_indicadores":[{"titulo_do_grupo":"PDO Level Results Indicators","indicador":[{"titulo_do_indicador":"Electricity generated, net","unidade_de_medida":"GWh\/year","baseline":"","end_target":"","subindicador":[{"titulo_do_subindicador":"on the island of S\u00e3o Vicente","unidade_de_medida":"GWh\/year","baseline":"66.01","end_target":"97.00"},{"titulo_do_subindicador":"on Santiago Island","unidade_de_medida":"GWh\/year","baseline":"198.52","end_target":"267.77"}]},{"titulo_do_indicador":"Electric system losses per year in Santiago Island, total","unidade_de_medida":"percentage","baseline":"35.4","end_target":"18.2","subindicador":false},{"titulo_do_indicador":"Direct beneficiaries of the project","unidade_de_medida":"number","baseline":"316,107","end_target":"335,534","subindicador":[{"titulo_do_subindicador":"of which are women (beneficiaries)","unidade_de_medida":"percentage","baseline":"52.00","end_target":"52.00"}]}]}],"documentos":[{"titulo":"Project Appraisal Document","referencia":"Report No: 58218-CV","ficheiro":{"ID":2491,"id":2491,"title":"PAD CAPE VERDE RRESP (Post ROC-negotiation Nov 11)","filename":"PAD-CAPE-VERDE-RRESP-Post-ROC-negotiation-Nov-11.pdf","filesize":4228711,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/PAD-CAPE-VERDE-RRESP-Post-ROC-negotiation-Nov-11.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-de-recuperacao-e-reforma-do-sector-de-eletricidade\/pad-cape-verde-rresp-post-roc-negotiation-nov-11\/","alt":"","author":"13","description":"Projecto de \u201cRecupera\u00e7\u00e3o e Reforma do Sector Electrico","caption":"Projecto de \u201cRecupera\u00e7\u00e3o e Reforma do Sector Electrico","name":"pad-cape-verde-rresp-post-roc-negotiation-nov-11","status":"inherit","uploaded_to":2304,"date":"2021-12-16 18:43:09","modified":"2021-12-16 18:44:10","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":[]},{"titulo":"Project Paper","referencia":"Report No: PP1458","ficheiro":{"ID":2538,"id":2538,"title":"Project Paper - P151979 2015-12-28 04 22 APPROVED","filename":"Project-Paper-P151979-2015-12-28-04-22-APPROVED.pdf","filesize":517378,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/Project-Paper-P151979-2015-12-28-04-22-APPROVED.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-de-recuperacao-e-reforma-do-sector-de-eletricidade\/project-paper-p151979-2015-12-28-04-22-approved-2\/","alt":"","author":"13","description":"Project Paper Refirma do Sector Eletrico","caption":"Project Paper Refirma do Sector Eletrico","name":"project-paper-p151979-2015-12-28-04-22-approved-2","status":"inherit","uploaded_to":2304,"date":"2022-01-16 22:30:25","modified":"2022-01-16 22:31:33","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":[]},{"titulo":"Project Closure Report","referencia":"Loan N \u00ba : 8115-CV","ficheiro":{"ID":2539,"id":2539,"title":"Relat encerr. IBRD Final- 23-09-18","filename":"Relat-encerr.-IBRD-Final-23-09-18.pdf","filesize":2059654,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/12\/Relat-encerr.-IBRD-Final-23-09-18.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-de-recuperacao-e-reforma-do-sector-de-eletricidade\/relat-encerr-ibrd-final-23-09-18\/","alt":"","author":"13","description":"Relat\u00f3rio Final Sector Electrico","caption":"Relat\u00f3rio Final Sector Electrico","name":"relat-encerr-ibrd-final-23-09-18","status":"inherit","uploaded_to":2304,"date":"2022-01-16 22:32:39","modified":"2022-01-16 22:33:09","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":[]}],"valor_inicial_moeda_estrangeira":"53500000","valor_adicional_moeda_estrangeira":"","valor_total_moeda_estrangeira":"53500000","moeda":"USD","area_de_intervencao_ambiental_e_social":{"ID":4961,"post_author":"10","post_date":"2023-04-19 16:07:12","post_date_gmt":"2023-04-19 17:07:12","post_content":"","post_title":"Complaint Management","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"gestao-de-reclamacoes","to_ping":"","pinged":"","post_modified":"2023-05-24 15:09:59","post_modified_gmt":"2023-05-24 16:09:59","post_content_filtered":"","post_parent":0,"guid":"https:\/\/backend-ugpe.gov.cv\/?post_type=ambiental_e_social&#038;p=4961","menu_order":0,"post_type":"ambiental_e_social","post_mime_type":"","comment_count":"0","filter":"raw","post_title_ml":"[:pt]Gest\u00e3o de Reclama\u00e7\u00f5es[:en]Complaint Management[:]","post_title_langs":{"pt":true,"en":true}}},"area_projeto":"Energy","_links":{"self":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/projetos\/2304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/projetos"}],"about":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/types\/projetos"}],"wp:attachment":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/media?parent=2304"}],"wp:term":[{"taxonomy":"areas_de_projeto","embeddable":true,"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/areas_de_projeto?post=2304"},{"taxonomy":"estado_do_projeto","embeddable":true,"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/estado_do_projeto?post=2304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}