{"id":1725,"date":"2021-10-26T19:17:44","date_gmt":"2021-10-26T20:17:44","guid":{"rendered":"https:\/\/backend-ugpe.gov.cv\/?post_type=projetos&#038;p=1725"},"modified":"2024-05-14T11:55:45","modified_gmt":"2024-05-14T12:55:45","slug":"projeto-teste","status":"publish","type":"projetos","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/","title":{"rendered":"COVID-19 Emergency Response Project"},"parent":0,"template":"","meta":{"om_disable_all_campaigns":false,"_mi_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"areas_de_projeto":[106],"estado_do_projeto":[66],"class_list":["post-1725","projetos","type-projetos","status-publish","hentry","areas_de_projeto-saude","estado_do_projeto-em-curso"],"acf":{"id_do_projeto":" P173857","gestor_do_projeto":{"ID":2575,"post_author":"13","post_date":"2022-01-28 11:21:45","post_date_gmt":"2022-01-28 12:21:45","post_content":"","post_title":"Special Projects Management Unit","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"ugpe","to_ping":"","pinged":"","post_modified":"2022-03-24 10:54:09","post_modified_gmt":"2022-03-24 11:54:09","post_content_filtered":"","post_parent":0,"guid":"https:\/\/backend-ugpe.gov.cv\/?post_type=gestor_de_projeto&#038;p=2575","menu_order":0,"post_type":"gestor_de_projeto","post_mime_type":"","comment_count":"0","filter":"raw","post_title_ml":"[:pt]Unidade de Gest\u00e3o de Projetos Especiais[:en]Special Projects Management Unit[:]","post_title_langs":{"pt":true,"en":true}},"data_de_entrada_em_vigor":"02\/03\/2020","data_de_encerramento":"31\/03\/2025","estado":"Em Curso","valor_total":"2040000000","valor_inicial":"510000000","valor_adicional":"1530000000","percentagem_de_execucao":"100","objetivo":"The COVID-19 Emergency Response Program Development Project aims to prevent, detect, and respond to the threat posed by COVID-19 and strengthen prepared national public health systems.","descricao":"This project is aligned with the COVID-19 Strategic Preparedness and Response Program (SPRP) and with the World Bank's global plans and commitments to strengthen countries to implement pandemic preparedness plans through interventions (including strengthening institutional capacity, technical assistance, loans, and investment). In this context, the Government of Cabo Verde has negotiated with the International Development Association (IDA) of the World Bank Group for its financing in the total amount of USD 5,000,000 (five million US dollars).","imagem":{"ID":2246,"id":2246,"title":"17522869.normal","filename":"17522869.normal.jpg","filesize":73974,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/17522869.normal.jpg","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/17522869-normal\/","alt":"Foto COVID-19","author":"13","description":"COVID-19","caption":"COVID-19","name":"17522869-normal","status":"inherit","uploaded_to":1725,"date":"2021-12-05 08:01:35","modified":"2021-12-05 08:01:59","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/default.png","width":800,"height":450,"sizes":{"thumbnail":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/17522869.normal-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/17522869.normal-300x169.jpg","medium-width":300,"medium-height":169,"medium_large":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/17522869.normal-768x432.jpg","medium_large-width":768,"medium_large-height":432,"large":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/17522869.normal.jpg","large-width":800,"large-height":450,"1536x1536":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/17522869.normal.jpg","1536x1536-width":800,"1536x1536-height":450,"2048x2048":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/17522869.normal.jpg","2048x2048-width":800,"2048x2048-height":450}},"entidades_beneficiarias":[{"ID":2396,"post_author":"13","post_date":"2021-12-09 19:35:17","post_date_gmt":"2021-12-09 20:35:17","post_content":"","post_title":"Cape Verdean population","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"cape-verdean-population","to_ping":"","pinged":"","post_modified":"2022-09-28 11:55:52","post_modified_gmt":"2022-09-28 12:55:52","post_content_filtered":"","post_parent":0,"guid":"https:\/\/backend-ugpe.gov.cv\/ent_beneficiarias\/cape-verdean-population\/","menu_order":52,"post_type":"ent_beneficiarias","post_mime_type":"","comment_count":"0","filter":"raw","post_title_ml":"[:pt]Popula\u00e7\u00e3o Caboverdiana[:en]Cape Verdean population[:]","post_title_langs":{"pt":true,"en":true}}],"componentes":[{"titulo_do_componente":"Component 1: Emergency Preparedness, Prevention and Response COVID-19","objetivo":"This component aims to provide immediate support to Cabo Verde to prevent COVID-19","moeda_componente":"USD","valor_moeda_estrangeira_componente":"4850000","valor":"494700000","beneficiarios_componentes":false,"subcomponente":[{"titulo_do_subcomponente":"Prevention of new cases of COVID-19 and spread","objetivo":"This subcomponent aims to help implement the preparedness and prevention measures outlined in the COVID-19 National Plan","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"800000","valor":"81600000","beneficiarios":false},{"titulo_do_subcomponente":"Strengthen national and subnational COVID-19 case detection","objetivo":"This subcomponent aims to help strengthen disease surveillance systems at the National Laboratory of Virology, in collaboration with public health laboratories within the national laboratory network, to improve case detection at both entry points and health facilities","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"1300000","valor":"132600000","beneficiarios":false},{"titulo_do_subcomponente":"Strengthen the national public health preparedness and response system","objetivo":"This subcomponent aims to provide assistance to improve the preparedness of the Cabo Verdean health system to provide emergency medical care while maintaining essential community services and to minimize risks to patients and health care providers","moeda_subcomponente":"USD","valor_moeda_estrangeira_subcomponente":"2600000","valor":"265200000","beneficiarios":false}],"indicador":[{"titulo_do_indicador":"Health posts with pandemic preparedness and response plans according to the Ministry of Health Guidelines","unidade_de_medida":"percentage","baseline":"18.00","end_target":"100.00","subindicador":false},{"titulo_do_indicador":"Operational digital platform for receiving individual vaccination data","unidade_de_medida":"yes\/no","baseline":"no","end_target":"yes","subindicador":false},{"titulo_do_indicador":"Communication\/community engagement campaign produced and implemented focusing on COVID-19 prevention activities and vaccine hesitation among priority target groups","unidade_de_medida":"number","baseline":"1.00","end_target":"2.00","subindicador":false},{"titulo_do_indicador":"Healthcare facilities with personal protection equipment and products and supplies for infection control, with no shortage of stock in the previous two weeks","unidade_de_medida":"percentage","baseline":"32.00","end_target":"100.00","subindicador":false},{"titulo_do_indicador":"The country has prepared a referral system for care for patients with COVID-19","unidade_de_medida":"yes\/no","baseline":"no","end_target":"yes","subindicador":false},{"titulo_do_indicador":"Additional ICU beds equipped and operational","unidade_de_medida":"number","baseline":"0.00","end_target":"20.00","subindicador":false},{"titulo_do_indicador":"Personal Protective Equipment (PPE) distributed to the general population","unidade_de_medida":"number","baseline":"0.00","end_target":"100.000.00","subindicador":false},{"titulo_do_indicador":"Additional equipped and operational intermediate care beds on Sal and Boa Vista Islands","unidade_de_medida":"number","baseline":"0.00","end_target":"20.00","subindicador":false},{"titulo_do_indicador":"National COVID-19 Immunization Plan Developed and Approved","unidade_de_medida":"yes\/no","baseline":"no","end_target":"yes","subindicador":false},{"titulo_do_indicador":"Frontline and essential health workers who benefit from the first phase of the vaccine who are women","unidade_de_medida":"percentage","baseline":"0.00","end_target":"100.00","subindicador":false},{"titulo_do_indicador":"Pharmacovigilance system (PVS) adapted to detect adverse events following vaccination (AEFI) for COVID19 vaccine","unidade_de_medida":"yes\/no","baseline":"no","end_target":"yes","subindicador":false},{"titulo_do_indicador":"Complaints registered through the Project's complaint management mechanism (RBM) resolved in a timely manner","unidade_de_medida":"percentage","baseline":"0.00","end_target":"40.00","subindicador":false}]},{"titulo_do_componente":"Component 2: Project Management, Monitoring and Evaluation (M&E)","objetivo":"This component will support the coordination and management of project activities, including","moeda_componente":"USD","valor_moeda_estrangeira_componente":"150000","valor":"15300000","beneficiarios_componentes":false,"subcomponente":false,"indicador":false}],"grupos_de_indicadores":[{"titulo_do_grupo":"Response to COVID-19","indicador":[{"titulo_do_indicador":"Suspected cases of COVID-19 tested per approved protocol","unidade_de_medida":"percentage","baseline":"0.00","end_target":"85.00","subindicador":false},{"titulo_do_indicador":"Diagnosed cases treated per approved protocol","unidade_de_medida":"percentage","baseline":"0.00","end_target":"50.00","subindicador":false},{"titulo_do_indicador":"Vaccinated population, which is included in the priority population targets defined in the national plan","unidade_de_medida":"percentage","baseline":"0.00","end_target":"100.00","subindicador":[{"titulo_do_subindicador":"Women","unidade_de_medida":"percentagem","baseline":"0.00","end_target":"45.00"}]},{"titulo_do_indicador":"Fully vaccinated adult population percentage","unidade_de_medida":"percentage","baseline":"0.00","end_target":"70.00","subindicador":[{"titulo_do_subindicador":"Women","unidade_de_medida":"percentage","baseline":"0.00","end_target":"40.00"}]},{"titulo_do_indicador":"National Virology Laboratory equipped with COVID-19 diagnostic equipment, test kits, and reagents per Ministry of Health guidelines","unidade_de_medida":"yes\/no","baseline":"no","end_target":"yes","subindicador":false}]}],"documentos":[{"titulo":"Project Appraisal Document PAD","referencia":"P173857","ficheiro":{"ID":2273,"id":2273,"title":"project appraisal document (pad) - P173857_Final","filename":"project-appraisal-document-pad-P173857_Final.pdf","filesize":1644809,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/project-appraisal-document-pad-P173857_Final.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/project-appraisal-document-pad-p173857_final\/","alt":"","author":"13","description":"PAD Projeto COVID-19","caption":"PAD Projeto COVID-19","name":"project-appraisal-document-pad-p173857_final","status":"inherit","uploaded_to":1725,"date":"2021-12-06 15:49:39","modified":"2021-12-06 15:50:01","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Documento"]},{"titulo":"Project Paper","referencia":"PAD4606","ficheiro":{"ID":2544,"id":2544,"title":"project paper - P177181_Final","filename":"project-paper-P177181_Final.pdf","filesize":1874647,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/project-paper-P177181_Final.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/project-paper-p177181_final\/","alt":"","author":"13","description":"Project Paper Projeto COVID-19","caption":"Project Paper Projeto COVID-19","name":"project-paper-p177181_final","status":"inherit","uploaded_to":1725,"date":"2022-01-17 13:59:50","modified":"2022-01-17 14:00:18","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Documento"]},{"titulo":"Additional Financing","referencia":"P173857","ficheiro":{"ID":2343,"id":2343,"title":"PEF-Additional Financing","filename":"PEF-Additional-Financing.pdf","filesize":2410037,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/PEF-Additional-Financing.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/pef-additional-financing\/","alt":"","author":"13","description":"Financiamento Adicional (P173857)","caption":"Financiamento Adicional (P173857)","name":"pef-additional-financing","status":"inherit","uploaded_to":1725,"date":"2021-12-08 15:43:46","modified":"2021-12-08 15:43:54","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Documento"]},{"titulo":"Environmental and Social Commitment Plan (PCAS)","referencia":"P173857","ficheiro":{"ID":4501,"id":4501,"title":"P177181 ESCP - CV HNP COVID - VACCINES REST AFIII","filename":"P177181-ESCP-CV-HNP-COVID-VACCINES-REST-AFIII.pdf","filesize":1061460,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/P177181-ESCP-CV-HNP-COVID-VACCINES-REST-AFIII.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/p177181-escp-cv-hnp-covid-vaccines-rest-afiii\/","alt":"","author":"13","description":"P177181 ESCP - CV HNP COVID - VACCINES REST AFIII","caption":"P177181 ESCP - CV HNP COVID - VACCINES REST AFIII","name":"p177181-escp-cv-hnp-covid-vaccines-rest-afiii","status":"inherit","uploaded_to":1725,"date":"2023-02-27 18:55:42","modified":"2023-02-27 18:55:52","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Plano"]},{"titulo":"Stakeholder Engagement Plan revised version February 2023","referencia":"P173857","ficheiro":{"ID":4502,"id":4502,"title":"P177181 SEP - CV HNP COVID - VACCINES REST AFIII","filename":"P177181-SEP-CV-HNP-COVID-VACCINES-REST-AFIII.pdf","filesize":3287892,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/P177181-SEP-CV-HNP-COVID-VACCINES-REST-AFIII.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/p177181-sep-cv-hnp-covid-vaccines-rest-afiii\/","alt":"","author":"13","description":"P177181 SEP - CV HNP COVID - VACCINES REST AFIII","caption":"P177181 SEP - CV HNP COVID - VACCINES REST AFIII","name":"p177181-sep-cv-hnp-covid-vaccines-rest-afiii","status":"inherit","uploaded_to":1725,"date":"2023-02-27 18:56:27","modified":"2023-02-27 18:56:35","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Plano"]},{"titulo":"Hospital Waste Management and Infection Control Plan","referencia":"P173857","ficheiro":{"ID":4900,"id":4900,"title":"Plano de Controlo de Infec\u00e7\u00e3o e Gest\u00e3o de res\u00edduos Hospitalares-REST AFIIICOVIDP","filename":"Plano-de-Controlo-de-Infeccao-e-Gestao-de-residuos-Hospitalares-REST-AFIIICOVIDP.pdf","filesize":1527262,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2023\/04\/Plano-de-Controlo-de-Infeccao-e-Gestao-de-residuos-Hospitalares-REST-AFIIICOVIDP.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/plano-de-controlo-de-infeccao-e-gestao-de-residuos-hospitalares-rest-afiiicovidp\/","alt":"","author":"13","description":"Plano de Controlo de Infec\u00e7\u00e3o e Gest\u00e3o de res\u00edduos Hospitalares-REST AFIIICOVIDP","caption":"Plano de Controlo de Infec\u00e7\u00e3o e Gest\u00e3o de res\u00edduos Hospitalares-REST AFIIICOVIDP","name":"plano-de-controlo-de-infeccao-e-gestao-de-residuos-hospitalares-rest-afiiicovidp","status":"inherit","uploaded_to":1725,"date":"2023-04-17 11:55:58","modified":"2023-05-30 10:17:26","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Plano"]},{"titulo":"Environmental and Social Framework","referencia":"P173857","ficheiro":{"ID":4901,"id":4901,"title":"Quadro de Gest\u00e3o Ambiental e Social - REST AFIII COVIDP","filename":"Quadro-de-Gestao-Ambiental-e-Social-REST-AFIII-COVIDP.pdf","filesize":5784457,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/Quadro-de-Gestao-Ambiental-e-Social-REST-AFIII-COVIDP.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/quadro-de-gestao-ambiental-e-social-rest-afiii-covidp\/","alt":"","author":"13","description":"Quadro de Gest\u00e3o Ambiental e Social - REST AFIII COVIDP","caption":"Quadro de Gest\u00e3o Ambiental e Social - REST AFIII COVIDP","name":"quadro-de-gestao-ambiental-e-social-rest-afiii-covidp","status":"inherit","uploaded_to":1725,"date":"2023-04-17 13:17:47","modified":"2023-04-17 13:17:59","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Quadro"]},{"titulo":"Environmental and Social Management Plan (ESMP) - Construction of the Ribeira das Patas Porto Novo SA Health Center","referencia":"P173857","ficheiro":{"ID":6270,"id":6270,"title":"PGAS_Centro de Sa\u00fade_PN_SA","filename":"PGAS_Centro-de-Saude_PN_SA.pdf","filesize":2442426,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/PGAS_Centro-de-Saude_PN_SA.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/pgas_centro-de-saude_pn_sa\/","alt":"","author":"13","description":"PGAS_Centro de Sa\u00fade_PN_SA","caption":"PGAS_Centro de Sa\u00fade_PN_SA","name":"pgas_centro-de-saude_pn_sa","status":"inherit","uploaded_to":1725,"date":"2023-12-14 10:41:07","modified":"2023-12-14 10:41:15","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Plano"]},{"titulo":"Environmental and Social Management Plan (ESMP) Construction of the Achada Monte Health Center","referencia":"P173857","ficheiro":{"ID":7234,"id":7234,"title":"PGAS_CONSTRU\u00c7\u00c3O CS ACHADA DO MONTE-final","filename":"PGAS_CONSTRUCAO-CS-ACHADA-DO-MONTE-final.pdf","filesize":5634158,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/PGAS_CONSTRUCAO-CS-ACHADA-DO-MONTE-final.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/pgas_construcao-cs-achada-do-monte-final\/","alt":"","author":"13","description":"PGAS_CONSTRU\u00c7\u00c3O CS ACHADA DO MONTE-final","caption":"PGAS_CONSTRU\u00c7\u00c3O CS ACHADA DO MONTE-final","name":"pgas_construcao-cs-achada-do-monte-final","status":"inherit","uploaded_to":1725,"date":"2024-04-08 15:55:23","modified":"2024-04-08 15:55:37","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":[]},{"titulo":"Infection Control and Hospital Waste Management Plan Achada Monte Health Center","referencia":"P173857","ficheiro":{"ID":7233,"id":7233,"title":"PCIGRH_CONSTRU\u00c7\u00c3O CS ACHADA DO MONTE_final","filename":"PCIGRH_CONSTRUCAO-CS-ACHADA-DO-MONTE_final.pdf","filesize":3489811,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/PCIGRH_CONSTRUCAO-CS-ACHADA-DO-MONTE_final.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/pcigrh_construcao-cs-achada-do-monte_final\/","alt":"","author":"13","description":"PCIGRH_CONSTRU\u00c7\u00c3O CS ACHADA DO MONTE_final","caption":"PCIGRH_CONSTRU\u00c7\u00c3O CS ACHADA DO MONTE_final","name":"pcigrh_construcao-cs-achada-do-monte_final","status":"inherit","uploaded_to":1725,"date":"2024-04-08 15:54:20","modified":"2024-04-08 15:54:32","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Plano"]},{"titulo":"CONTRACTOR'S ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (C-ESMP) TEMPLATE","referencia":"P173857","ficheiro":{"ID":7229,"id":7229,"title":"Anexo III - Modelo de Plano de Gest\u00e3o Ambiental e Social PGAS-E_CoC","filename":"Anexo-III-Modelo-de-Plano-de-Gestao-Ambiental-e-Social-PGAS-E_CoC.docx","filesize":398939,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2024\/04\/Anexo-III-Modelo-de-Plano-de-Gestao-Ambiental-e-Social-PGAS-E_CoC.docx","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/anexo-iii-modelo-de-plano-de-gestao-ambiental-e-social-pgas-e_coc\/","alt":"","author":"13","description":"Anexo III - Modelo de Plano de Gest\u00e3o Ambiental e Social PGAS-E_CoC","caption":"Anexo III - Modelo de Plano de Gest\u00e3o Ambiental e Social PGAS-E_CoC","name":"anexo-iii-modelo-de-plano-de-gestao-ambiental-e-social-pgas-e_coc","status":"inherit","uploaded_to":1725,"date":"2024-04-08 13:30:26","modified":"2024-05-14 12:53:46","menu_order":0,"mime_type":"application\/vnd.openxmlformats-officedocument.wordprocessingml.document","type":"application","subtype":"vnd.openxmlformats-officedocument.wordprocessingml.document","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Plano"]},{"titulo":"Infection Control and Hospital Waste Management Plan (PCIGRH) for the Ribeira das Patas Health Center.","referencia":"P173857","ficheiro":{"ID":7473,"id":7473,"title":"PCIGRH_CONSTRU\u00c7\u00c3O CS RIBEIRA DAS PATAS PORTO NOVO","filename":"PCIGRH_CONSTRUCAO-CS-RIBEIRA-DAS-PATAS-PORTO-NOVO.pdf","filesize":3048318,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2021\/10\/PCIGRH_CONSTRUCAO-CS-RIBEIRA-DAS-PATAS-PORTO-NOVO.pdf","link":"https:\/\/backend-ugpe.gov.cv\/en\/projetos\/projeto-teste\/pcigrh_construcao-cs-ribeira-das-patas-porto-novo\/","alt":"","author":"13","description":"PCIGRH_CONSTRU\u00c7\u00c3O CS RIBEIRA DAS PATAS PORTO NOVO","caption":"PCIGRH_CONSTRU\u00c7\u00c3O CS RIBEIRA DAS PATAS PORTO NOVO","name":"pcigrh_construcao-cs-ribeira-das-patas-porto-novo","status":"inherit","uploaded_to":1725,"date":"2024-05-14 12:53:31","modified":"2024-05-14 12:53:41","menu_order":0,"mime_type":"application\/pdf","type":"application","subtype":"pdf","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/document.png"},"icone":false,"tipo_documento":["Plano"]}],"valor_inicial_moeda_estrangeira":"5000000","valor_adicional_moeda_estrangeira":"15000000","valor_total_moeda_estrangeira":"20000000","moeda":"USD","area_de_intervencao_ambiental_e_social":{"ID":4961,"post_author":"10","post_date":"2023-04-19 16:07:12","post_date_gmt":"2023-04-19 17:07:12","post_content":"","post_title":"Complaint Management","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"gestao-de-reclamacoes","to_ping":"","pinged":"","post_modified":"2023-05-24 15:09:59","post_modified_gmt":"2023-05-24 16:09:59","post_content_filtered":"","post_parent":0,"guid":"https:\/\/backend-ugpe.gov.cv\/?post_type=ambiental_e_social&#038;p=4961","menu_order":0,"post_type":"ambiental_e_social","post_mime_type":"","comment_count":"0","filter":"raw","post_title_ml":"[:pt]Gest\u00e3o de Reclama\u00e7\u00f5es[:en]Complaint Management[:]","post_title_langs":{"pt":true,"en":true}}},"area_projeto":"Sa\u00fade","_links":{"self":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/projetos\/1725","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/projetos"}],"about":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/types\/projetos"}],"wp:attachment":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/media?parent=1725"}],"wp:term":[{"taxonomy":"areas_de_projeto","embeddable":true,"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/areas_de_projeto?post=1725"},{"taxonomy":"estado_do_projeto","embeddable":true,"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/estado_do_projeto?post=1725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}