{"id":7591,"date":"2024-05-29T16:53:59","date_gmt":"2024-05-29T17:53:59","guid":{"rendered":"https:\/\/backend-ugpe.gov.cv\/?post_type=noticias&#038;p=7591"},"modified":"2024-05-29T17:31:38","modified_gmt":"2024-05-29T18:31:38","slug":"assinado-contrato-para-construcao-do-centro-de-saude-de-ribeira-das-patas-santo-antao-com-financiamento-do-governo-de-cabo-verde-e-do-banco-mundial","status":"publish","type":"noticias","link":"https:\/\/backend-ugpe.gov.cv\/en\/noticias\/assinado-contrato-para-construcao-do-centro-de-saude-de-ribeira-das-patas-santo-antao-com-financiamento-do-governo-de-cabo-verde-e-do-banco-mundial\/","title":{"rendered":"Contract signed for the construction of the Ribeira das Patas Health Center-Santo Ant\u00e3o, with funding from the Cape Verde government and the World Bank"},"content":{"rendered":"<p><\/p>\n<p style=\"text-align: justify;\">The Government of Cape Verde has taken a significant step towards improving health services in Santo Ant\u00e3o with the signing of the contract for the construction of the Ribeira das Patas Health Center, with funding from the Government of Cape Verde and the World Bank, as part of the \u201cCape Verde COVID-19 Emergency Response\u201d Project, implemented by the Special Projects Management Unit (UGPE).<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">The signing of the contract with the firm that won the public tender, Const-ROL Projectos e Fiscaliza\u00e7\u00e3o, Lda., marks the official start of work on the construction of the state-of-the-art health center, which aims to strengthen the health infrastructure in the region.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">The construction project, which should be completed in 10 months from the date of consignment, is intended to strengthen the health infrastructure in the region, and improve access to medical care for the population of Ribeira das Patas and surrounding areas, reaffirming the government&#8217;s commitment to strengthening the health system, especially in the face of challenges such as those faced during the COVID-19 pandemic.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">You can also follow the progress of the construction of the Ribeira das Patas Health Center through the government&#8217;s official communication channels and the Special Projects Management Unit (UGPE).<\/p>\n<p style=\"text-align: justify;\">\n<p><\/p>","protected":false},"template":"","meta":{"om_disable_all_campaigns":false,"_mi_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[],"categoria_da_noticia":[98],"class_list":["post-7591","noticias","type-noticias","status-publish","hentry","categoria_da_noticia-projeto-covid-19"],"acf":{"resumo_da_noticia":"","imagem":{"ID":7592,"id":7592,"title":"1","filename":"1.jpg","filesize":198567,"url":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2024\/05\/1.jpg","link":"https:\/\/backend-ugpe.gov.cv\/en\/noticias\/assinado-contrato-para-construcao-do-centro-de-saude-de-ribeira-das-patas-santo-antao-com-financiamento-do-governo-de-cabo-verde-e-do-banco-mundial\/1-10\/","alt":"1","author":"13","description":"1","caption":"1","name":"1-10","status":"inherit","uploaded_to":7591,"date":"2024-05-29 17:53:34","modified":"2024-05-29 17:53:55","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/backend-ugpe.gov.cv\/wp-includes\/images\/media\/default.png","width":1384,"height":769,"sizes":{"thumbnail":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2024\/05\/1-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2024\/05\/1-300x167.jpg","medium-width":300,"medium-height":167,"medium_large":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2024\/05\/1-768x427.jpg","medium_large-width":768,"medium_large-height":427,"large":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2024\/05\/1-1024x569.jpg","large-width":1024,"large-height":569,"1536x1536":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2024\/05\/1.jpg","1536x1536-width":1384,"1536x1536-height":769,"2048x2048":"https:\/\/backend-ugpe.gov.cv\/wp-content\/uploads\/2024\/05\/1.jpg","2048x2048-width":1384,"2048x2048-height":769}},"atividade":false},"_links":{"self":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/noticias\/7591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/types\/noticias"}],"wp:attachment":[{"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/media?parent=7591"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/categories?post=7591"},{"taxonomy":"categoria_da_noticia","embeddable":true,"href":"https:\/\/backend-ugpe.gov.cv\/en\/wp-json\/wp\/v2\/categoria_da_noticia?post=7591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}